Prefab modular home on delivery flatbed with crane overhead, foundation bolts gleaming in morning light, worker in hard hat watching
// Factory-Built. Foundation-Ready.

Built in the factory.
Home by Friday.

Locked price. Locked timeline.

In writing.

Configure Your HomeDownload the Guarantee Document →

Avg. build cost

$187,400

all-in, delivered

On-time delivery

99.2%

across 847 builds

Warranty

30 years

structural guarantee

Price overruns

$0

contractually enforced

Scroll
CLT Wall Panels
CNC Precision Cut
72-Hour Install
Locked Price Contract
30-Year Structural Warranty
Zero Cost Overruns
Foundation-Ready Delivery
Off-Site Factory Build
CLT Wall Panels
CNC Precision Cut
72-Hour Install
Locked Price Contract
30-Year Structural Warranty
Zero Cost Overruns
Foundation-Ready Delivery
Off-Site Factory Build
// Guarantee #1

The Price-Lock
Guarantee.

Traditional builds average 23% over budget. Our contract has one number. That number doesn't move.

Traditional Build

Architect revisions
+$18,400
Material cost spike (lumber)
+$24,700
Labor overrun (weather delay)
+$11,200
Permit extension fees
+$3,800
Subcontractor no-show
+$8,600
Final inspection re-work
+$5,900
Budget vs. actual+23% avg overrun
QuotedActual
PRICE LOCKED

Prefab Flat Contract

Factory build + CNC routing
Included
Transport + crane installation
Included
Foundation bolt-down
Included
Utility rough-in connections
Included
Final inspection
Included
Cost overruns
$0.00
Budget vs. actual$0.00 overrun
QuotedActual

The fine print is the selling point.

Our contract specifies the exact delivered price down to the bolt. Any deviation from spec is our cost, not yours. Read it before you sign — we insist.

Download Guarantee Document
// Guarantee #2

Factory to foundation.
Under 72 hours.

Every milestone has a contractual deadline. Miss it, and the penalty credits hit your account automatically.

Day 0

Contract Signed

Price locked. Delivery date locked. Penalty clauses active from this moment.

Days 1–18

CNC Factory Build

CLT panels cut to ±0.5mm tolerance. Walls, roof cassettes, and floor decks assembled in climate-controlled facility.

Days 19–21

Quality Inspection

Third-party structural engineer signs off on every panel. Load-test data logged to your file.

Day 22On-Site

Loaded on Flatbed

Your home leaves the factory. GPS tracker link sent to your phone. ETA confirmed.

Day 23On-Site

On-Site Arrival

Crane positioned. Foundation bolts verified. Installation crew on standby.

Day 24–25On-Site

Panel Assembly

Walls rise. Roof goes on. Utilities rough-in completed. Weather-tight in 31 hours.

Day 25On-Site

Final Inspection

Local inspector signs off. Certificate of occupancy issued. Keys handed over.

Penalty Clauses

Printed in the contract. Enforced automatically.

Every hour beyond the contracted delivery date: $350 credit

Every day beyond installation window: $1,200 credit

Any cost above contracted price: 100% absorbed by Prefab

Structural defect within 30 years: Full remediation at zero cost

"We've paid out $0 in penalty credits across 847 builds. Not because the clause doesn't exist — because we don't miss deadlines."

— Marcus Webb, Operations Director

Configure Your Home →
// Guarantee #3

Structural guarantee.
Thirty years.

CLT is stronger than dimensional lumber. We have the load tests to prove it. Engineering certifications come with every build.

Factory floor showing CNC router cutting cross-laminated timber wall panels with precision

CNC Factory Floor

±0.5mm tolerance. Every panel.

Wind resistance

140 mph

tested at 160 mph

Snow load

60 psf

exceeds code by 40%

Seismic zone

D2

highest residential rating

Fire rating

1-hr

CLT char layer protection

Structural Warranty

30 Years

Full remediation at zero cost. Any structural defect, any time, in the first thirty years. We own it.

ICC Structural Certification

International Code Council · Certified 2024

APA Engineered Wood

APA — The Engineered Wood Assoc. · Certified 2024

Energy Star Certified

U.S. Environmental Protection Agency · Certified 2024

ISO 9001:2015

Quality Management Systems · Certified 2024

Load-test footage and full engineering report are included with every build file. Your bank, your insurer, and your inspector will have everything they need.

Aerial view of prefab homes in a pocket neighborhood development
// Ready to build?

Your home is
waiting in the factory.

Choose your footprint, finishes, and delivery region. Get a locked quote in under ten minutes.

847

Homes delivered

58 hrs

Avg. install time

$0

Price overruns

30 yrs

Warranty