Eight homes.
Every price on record.
Click any model to see the exact delivered cost, specs, and your guarantee stamp.








Factory to foundation.
Under 72 hours.
Every milestone has a contractual deadline. Miss it, and the penalty credits hit your account automatically.
Contract Signed
Price locked. Delivery date locked. Penalty clauses active from this moment.
CNC Factory Build
CLT panels cut to ±0.5mm tolerance. Walls, roof cassettes, and floor decks assembled in climate-controlled facility.
Quality Inspection
Third-party structural engineer signs off on every panel. Load-test data logged to your file.
Loaded on Flatbed
Your home leaves the factory. GPS tracker link sent to your phone. ETA confirmed.
On-Site Arrival
Crane positioned. Foundation bolts verified. Installation crew on standby.
Panel Assembly
Walls rise. Roof goes on. Utilities rough-in completed. Weather-tight in 31 hours.
Final Inspection
Local inspector signs off. Certificate of occupancy issued. Keys handed over.
Penalty Clauses
Printed in the contract. Enforced automatically.
Every hour beyond the contracted delivery date: $350 credit
Every day beyond installation window: $1,200 credit
Any cost above contracted price: 100% absorbed by Prefab
Structural defect within 30 years: Full remediation at zero cost
"We've paid out $0 in penalty credits across 847 builds. Not because the clause doesn't exist — because we don't miss deadlines."
— Marcus Webb, Operations Director


